1What an EICR covers
An EICR is a report on the condition of the fixed electrical installation: the wiring, sockets, light fittings, the consumer unit (fuse box) and other permanently connected parts. The electrician inspects and tests them against the national wiring standard, BS 7671, and records anything that's unsafe or needs looking at.
It doesn't cover appliances that plug in, such as a kettle or washing machine. In Scotland those must be tested too, as a PAT test. Elsewhere PAT testing is good practice rather than a legal requirement for most lets.
2How often you need one
At least every 5 years. If the electrician sets an earlier date for the next inspection in the report, that earlier date applies instead. Keep the latest report: you'll need to give a copy to the next electrician who inspects.
3England
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 apply to private tenancies, including HMOs. You must:
- make sure the electrical installation meets the wiring standards for as long as the property is let;
- have it inspected and tested by a qualified and competent person at least every 5 years;
- give each existing tenant a copy of the report within 28 days of the inspection, and give new tenants a copy before they move in;
- give a copy to a prospective tenant within 28 days if they ask for one, and give a copy to the council if it asks;
- carry out any remedial or further investigation work the report requires within 28 days, or sooner if the report says, then give written confirmation that the work is done to your tenants and the council within 28 days of finishing it.
Councils enforce the rules. They can arrange the work themselves and charge you for it, and fine you up to £40,000 for each breach (raised from £30,000 on 1 November 2025).
4Wales
Under the Renting Homes (Wales) Act 2016, a rented home must be fit for human habitation, and the Fitness for Human Habitation Regulations 2022 make electrical safety part of that. You must:
- make sure there's a valid electrical condition report for the whole time the home is occupied. A report is valid for 5 years, or until any earlier date it gives for the next inspection;
- give the contract-holder (tenant) a copy of the latest report within 14 days of the start of the contract;
- give a copy of any new report within 14 days of that inspection;
- give written confirmation of any electrical work done during the contract within 14 days.
If you don't, the home counts as unfit for human habitation. In 2024 the High Court confirmed that contract-holders don't have to pay rent for any period when that applies.
5Scotland
In Scotland, electrical safety is part of the Repairing Standard under the Housing (Scotland) Act 2006. Landlords must have an electrical safety inspection at least every 5 years, made up of two parts:
- an EICR on the fixed installation;
- a PAT test on any electrical appliances you provide. Tenants' own appliances aren't included.
The inspection must have been done in the 5 years before a tenancy starts, so you don't need a new one for every new tenant. Give the tenant a copy before the tenancy starts. Scottish Government guidance also requires RCD protection in the consumer unit, which the EICR will check.
6Northern Ireland
The Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024 apply to private tenancies. They started on 1 April 2025 for new tenancies, and from 1 December 2025 they apply to every private tenancy.
- Have the electrical installation inspected and tested by a qualified person at least every 5 years.
- Give your tenants a copy of the report, and give one to the council if it asks.
- Carry out any remedial work the report requires within 28 days, or sooner if it says.
7Choosing an electrician
It's your job to make sure the person doing the inspection is qualified and competent. Electricians registered with a competent person scheme, such as NICEIC or NAPIT, have been assessed for this kind of work. Ask whether they're qualified to carry out periodic inspection and testing, and check their membership on the scheme's website.
8Understanding the results
Each issue in an EICR is given a code:
- C1 (danger present): needs fixing straight away. The electrician will usually make it safe there and then.
- C2 (potentially dangerous): needs fixing urgently.
- FI (further investigation needed): needs looking into without delay.
- C3 (improvement recommended): not required to pass, but worth considering.
A report with any C1, C2 or FI is "unsatisfactory", and the work to fix those items falls under the remedial deadlines above.
?Common questions
How long is an EICR valid for a rental?
Up to 5 years. If the report recommends the next inspection sooner, that earlier date applies.
Do I need a new EICR for every new tenant?
No. A current report covers new tenancies until it runs out. You just need to give each new tenant a copy at the right time.
Does an EICR cover appliances?
No, only the fixed installation. In Scotland you also need a PAT test on appliances you provide. Elsewhere it's good practice.
What does an unsatisfactory EICR mean?
The report found at least one C1, C2 or FI item. You must get those fixed within 28 days, or sooner if the report says, and confirm in writing that the work has been done.
Can I do my own EICR?
Only if you're a qualified and competent electrician. Otherwise you must use one.
→Official sources